2026-09-15Cross-border impactAI summary

Maersk introduces No MRN, No Load deadline for cargo movements

Key facts6

  • Maersk will stop loading cargo destined for or transiting through the European Union without a valid Movement Reference Number (MRN) from 30 September 2026.
  • The “No MRN, No Load” policy applies to cargo that requires an Import Control System 2 (ICS2) Entry Summary Declaration, under which advance safety and security data must be submitted for goods entering or transiting the EU.
  • A valid MRN, confirming EU Customs acceptance of the ICS2 declaration, must be obtained before affected cargo can be confirmed for loading from 30 September 2026.
  • If Maersk does not receive the MRN at least 24 hours before a vessel arrives at the relevant loading port, the shipment will be excluded from the load list and may be rolled to a later vessel from 30 September 2026.
  • Rejected ICS2 filings must be corrected and accepted before cargo is treated as compliant; Maersk also requires a valid six-digit Harmonised System code for each cargo item and sufficiently detailed cargo descriptions.
  • ICS2 was extended to maritime and inland-waterway carriers in June 2024 and to maritime house-level filers, including freight forwarders and consolidators, in December 2024. The Maersk policy applies to relevant vessels arriving at their first applicable loading port on or after 30 September 2026.

Trade impact3

  • Shippers, freight forwarders and customs declarants using Maersk for EU-bound or EU-transiting cargo should build ICS2 filing acceptance and MRN transmission into their pre-loading controls, allowing for Maersk’s 24-hour cutoff before vessel arrival at the loading port.
  • Review shipping-instruction processes before 30 September 2026 to ensure each consignment has accurate six-digit HS codes and specific goods descriptions, since incomplete or rejected filings must be corrected and accepted before loading.
  • For affected shipments, confirm which party is responsible for the ICS2 declaration and for supplying the accepted MRN to Maersk; failure to do so can result in exclusion from the load list and vessel rollover.

The headline and summary of this briefing were written by AI from the coverage below. They may contain errors, so please check the original articles and the law for anything important. This is general information, not legal or customs advice.

Coverage1

  1. Freight NewsSep 14

    Maersk sets ‘No MRN, No Load’ deadline

    Public / Article Detail on NewsDesk CMS. A unified back-office management platform designed to streamline operations.

Headlines, excerpts and images are what each publisher shares as its link preview. Selecting one opens the publisher's page. Publishers and rights holders: to have a preview removed, write to contact@kustomsflow.com